Roadworks – Valley Road & Coombe Lane

Works are due to commence on Monday 22nd June and will have a duration of approximately 4 weeks (Mon – Fr 8am to 5pm) with 3-way traffic light control of both roads — to upgrade the surface water network of the two roads.